301 results:
21. Installation Works  
INSTALLATION WORKS GENERAL At the construction site the unique working conditions such as extreme temperatures, call for a team of highly qualified specialists and experts. HORN® employs a pool of  
22. Heat Up  
HEAT UP  
23. Tin Bath Shutdown  
TIN BATH SHUTDOWN GENERAL Experienced team Special equipment for draining the tin If the tin bath requires a cold repair or needs to be preserved before a period of non-use, it must first be  
24. Furnaces  
HEAT UP: FURNACES GENERAL When the furnace is built, the whole system has to be heated up in order to produce high quality glass afterwards. A precise and controlled heating process is required to  
25. Lehr  
HEAT UP: LEHR GENERAL Experienced experts Cold tests Precise tempering plan and control of the tempering curve The lehr is one of the most important areas of the glass production line. Ther  
26. Tin Bath  
HEAT UP: TIN BATH GENERAL Experienced experts Cold tests Special tempering equipment for Zone 0 and spout Precise tempering plan and control of the tempering curve Safe tin bed formation  
27. Furnaces  
SUPERVISION: FURNACES GENERAL Constructing a new furnace or repairing an existing one requires experts to supervise the entire works. HORN® provides specialists for the construction and installatio  
28. Tin Bath  
SUPERVISION: TIN BATH GENERAL The experts at HORN® have years of experience in the construction and installation of complex structures. Under the guidance of experienced supervisors, the tin bath c  
29. Lehr  
SUPERVISION: LEHR GENERAL The experts at HORN® have years of experience in the construction and installation of complex machines and equipment. The lehr is a complex machine that also has to satisf  
30. Automation  
SUPERVISION: AUTOMATION GENERAL The hot end of a float glass production line consists of many machines and various equipment that must all work in perfect harmony with one another. If a machine or  
Search results 21 until 30 of 301